UAB “Kauno kogeneracinė jėgainė”
client.
Kaunas CHP plant, site electrification. 10/0,4 kV lines construction, including designing, installing, testing, maintenance, and preparation of documents.
Electrical installation works for up to 110Kv voltage“10/110 Kv Biruliskiu TP. 10/6/0,69/0,4kV cabling, distribution boards, safety switches, cable ways, earthing, heat tracing installations, technological equipment connection, testing and commissioning. Fire alarm, system, Emergency public addressing system, Telecommunications, CCTV system, Access control system, TV and cameras system installations. Testing and commissioning.