Skip to content
    • Vilniaus pl. 4, LT-96327 Sudmantai
    • [email protected]
    • 7:30-16:30
    • +370 46 300 764
NRG SiteNRG Site
  • About us
  • Projects
  • Services
  • Contacts
  • EN EN
    • LT LT
    • EN EN
  • EN EN
    • LT LT
    • EN EN

Projects

Industrial

Renewable energy

Residential

LV/MV/HV cable lines installation and connection

Public 

 

VILNIUS COMBINED HEAT AND POWER PLANT

/10/6/0,69/0,4kV cabling, distribution boards, cable ways and constructions, heat tracing installations, technological equipment connection, testing and commissioning. Maintenance and operation of 10/0,4kV electrical equipment. Instrumentation measuring devices (according hookup drawings) installation. Instrumentation cabling and connection. Testing and commissioning.

Client: Steinmuller Babock Environment

I Kaunas CHP plant, site electrification.10/0,4 kV lines construction, including designing, installing, testing, maintenance, and preparation of documents.

II Electrical installation works for up to 110Kv voltage“10/110 Kv Biruliskiu TP. 10/6/0,69/0,4kV cabling, distribution boards, safety switches, cable ways, earthing, heat tracing installations, technological equipment connection, testing and commissioning. Fire alarm, system, Emergency public addressing system, Telecommunications, CCTV system, Access control system, TV and cameras system installations. Testing and commissioning.

III Part of security alarm installation.

Client:  UAB “Kauno kogeneracinė jėgainė“

KLAIPĖDOS NAFTA

Quay No. 1 – I step of engineering constructions works.

Quay No. 1 – I step of engineering constructions works.

 Operation (handling and storage) and maintenance of oil, petroleum, gas and chemical products terminals.

Client: AB „Klaipėdos nafta“

ORLEN LIETUVA

Replacement of 110/6kv transformers substation at AB „Orlen Lietuva“ thermal power plant.

 

Replacement of 110/6kv transformers substation at AB „Orlen Lietuva.

Client: UAB „Stiemo“

KAUNAS COGENERATION POWER PLANT

Construction project

I Kaunas CHP plant, site electrification.10/0,4 kV lines construction, including designing, installing, testing, maintenance, and preparation of documents.

II Electrical installation works for up to 110Kv voltage“10/110 Kv Biruliskiu TP. 10/6/0,69/0,4kV cabling, distribution boards, safety switches, cable ways, earthing, heat tracing installations, technological equipment connection, testing and commissioning. Fire alarm, system, Emergency public addressing system, Telecommunications, CCTV system, Access control system, TV and cameras system installations. Testing and commissioning.

III Part of security alarm installation.

Client:  UAB “Kauno kogeneracinė jėgainė“

REHAU 

Factory construction project

 

I Kaunas CHP plant, site electrification.10/0,4 kV lines construction, including designing, installing, testing, maintenance, and preparation of documents.

II Electrical installation works for up to 110Kv voltage“10/110 Kv Biruliskiu TP. 10/6/0,69/0,4kV cabling, distribution boards, safety switches, cable ways, earthing, heat tracing installations, technological equipment connection, testing and commissioning. Fire alarm, system, Emergency public addressing system, Telecommunications, CCTV system, Access control system, TV and cameras system installations. Testing and commissioning.

III Part of security alarm installation.

Client:  UAB “Kauno kogeneracinė jėgainė“

VIKTORIJOS

Hotel reconstruction project

 

The project of Victoria hotel building and other building-backyard reconstrucion and residential building reconstruction and changing to the hotel,  doing elektrical installation works: full implementation of facade lighting soulutions, installation of interior lighting control and security systems.

Client: UAB „Pamario restauratorius“

 

TASTY FOODS

UAB „Tasty Food“  Internal electrotechnics. Installation of technological equipments.

Installation of automation control boards.

Client: UAB „Valdymo automatika“

ORION GLOBAL PET

“Indorama square”

Existing electrical networks protection works, introductory network installation, ramp lighting, territory lighting installation and fence earthing works. The solar power plant installation works,  preparation of work project, electro physical measurements, preparation of  documentation accordance to technical project.

Client: UAB “RNDV Group”

 

KJKK BEGA

Reconstruction of the storage of liquid products and extension works Project.

Klaipėda Stevedoring company  BEGA. The storage of liquid products reconstruction and extension works Project.

Electrical installation works,  start-up and adjustment works, documentation works.

Client: UAB KJKK „Bega”

 

more projects

Contacts

Vilniaus pl. 4, LT-96327 Sudmantai

+370 46 300 764 
[email protected]

MENU

About us

Services

Projects

Contacts

Privacy Policy

NRG Site 2025 @ All rights reserved

Contacts

Vilniaus pl. 4, LT-96327 Sudmantai

+370 46 300 764 
[email protected]

MENU

About us

Services

Projects

Contacts

Privacy Policy

NRG Site 2025 @ All rights reserved  

  • About us
  • Projects
  • Services
  • Contacts