Installation of HV (3/110 kV) substation, 30 kV cabling from substation till 11 WTG units and 110 kV overhead line reconstruction for Substation Wind Turbine Park connection to LITGRID network according to submitted Technical Design Project and technical documentation.
MV/HV CABLE LINES KOPLI-VESKIMETSA AND VESKIMETSA-VOLTA, TALLINN, ESTONIA