KLAIPĖDA STATE UNIVERSITY OF APPLIED SCIENCES
Installation of a research laboratory for low-energy buildings
JURBARKAS WIND PARK JWTP-85
Erect 3/110 kV substation, 30 kV cabling from substation till 11 WTG units and 110 kV air line reconstruction for Substation Wind Turbine Park connection to LITGRID network according to submitted Technical Design Project and technical documentation.
ORION GLOBAL PET
Solar power plant
Existing electrical networks protection works, introductory network installation, ramp lighting, territory lighting installation and fence earthing works. The solar power plant installation works, preparation of work project, electro physical measurements, preparation of documentation accordance to technical project.
Client: UAB „RNDV Group“
UAB „KLAIPĖDOS VANDUO“
Solar power plant
Design, installation and coordination of a 3.2 MW solar park to connect to the 10kV grid and the customer’s existing grid. Design of a solar photovoltaic power plant. Installation of the mounting structures for the photovoltaic modules of the power plant. Installation of inverters (inverter), power metering, instrumentation, cabling and other electrical equipment. Installation of current converters, distribution panel or transformer, electrical safety and switching equipment. Installation of earthing circuit, calibration-tuning of current converters, installation of remote monitoring equipment. Installation of video surveillance and security system (works and materials). Start-up-tuning works.
NEO GROUP
Solar power plant
1000kW solar power plant‘s installation of AC equipment and connection to the distribution system.
Client: UAB “EST LT”
MĖŽIONYS
Solar power plant

LT